Longyearbyen · 78.22 N 15.63 E
Svalbard Wire(https://svalbardwire.com/)
Est. 2026
Everything said about Svalbard, in one place
Monday 16 November 2026 No. 22 Topic Every topic(https://svalbardwire.com/topics) Find(https://svalbardwire.com/find)
In depth In depth(https://svalbardwire.com/in-depth)
Graphics(https://svalbardwire.com/graphics)
In town Events(https://svalbardwire.com/in-town)
Tours(https://svalbardwire.com/tours)
Services and deadlines(https://svalbardwire.com/services)
Living here(https://svalbardwire.com/living-here)
History Timeline(https://svalbardwire.com/history)
Objects(https://svalbardwire.com/objects)
Culture The Shelf(https://svalbardwire.com/shelf)
On screen(https://svalbardwire.com/screen)
Power and borders(https://svalbardwire.com/topics#power-and-borders) Security and sovereignty
Norway's sovereignty over Svalbard, the Svalbard Treaty, and the security measures around research, cables and shipping.
Also called: Svalbard Treaty, Arctic Way
Where it stands
Arctic Way, a 2,350 km subsea cable from Bodø via Jan Mayen to Svalbard, is due to open in 2028. Until then, the two cables from 2004 are being upgraded to keep working.
Svalbard gets world's northernmost subsea cable system(https://svalbardwire.com/2025-02-14/svalbard-gets-worlds-northernmost-subsea-cable-system)
To Upgrade Existing Subsea Fibre Cables to Svalbard and Deploy Technology on New Cable System(https://svalbardwire.com/2026-10-16/to-upgrade-existing-subsea-fibre-cables-to-svalbard-and-deploy-technology-on-new)
Checked 27 October 2026
Reports The 10 newest of 31 reports
Report 14 November 2026 Defence minister expects competition for Arctic to grow(https://svalbardwire.com/2026-11-14/defence-minister-expects-competition-for-arctic-to-grow) Forsvarets forum
Report 14 November 2026 Svalbard icebreaker captain calls for two more ships(https://svalbardwire.com/2026-11-14/svalbard-icebreaker-captain-calls-for-two-more-ships) Forsvaretsforum